thelab's blog

Frames are up!

Here we are looking the length of the bar towards West Belt frontage, the top window is on the mezzanine floor, horseshoe shaped bar to the left where the drainage pipes are:

Trusses installed

Courtyard trusses were installed today!  After years of collecting recycled building materials this was a monumental day.  The ex-Wards Brewery trusses are the very first recycled pieces to be incorporated into The Laboratory build - so much more to come.

Stairway to heaven?

The staircase to mezzanine in situ.  Still a bit rickety and needing some TLC.  Turns out the hand rail so too low to comply with building regs blah blah blah...  Rest assured, we are determined to make this work!

Pages

Subscribe to RSS - thelab's blog